Skip to Content

REFERENCES

hsb edelstahlschwimmbecken hero referenz UFO02

feel the future: stainless steel swimming pools for generations

Next
Prev

Wattens Alpenbad | Austria

Client Planner
  • Water Surface
  • Year of Construction
Market town Wattens
  • Architectural office Pichler
  • 850 m²
  • 2018
Next
Prev

Thumersbach Strandbad | Austria

Infinity pool with panoramic view

Client Planner
  • Water Surface
  • Year of Construction
Leisure centre Zell am See
  • TB PRO PLAN GmbH
  • 312 m²
  • 2017
Next
Prev

Pfarrwerfen | Austria

The world’s first stainless steel swimming pool in Pfarrwerfen is our first and oldest reference. This swimming pool is still in operation today – apart from a few adaptations due to changing laws!

Client Planner
  • Water Surface
  • Year of Construction
Community Pfarrwerfen
  • 556 m²
  • 1969
Next
Prev

Nenzing | Austria

In addition to a 25-metre and a 50-metre sports pool, the attractions include an aquafit pool, an adventure pool with a current channel, a wave ball, two slides and a diving pool.

Client Planner
  • Water Surface
  • Year of Construction
Walgau Leisure & infrastructure Ltd.
  • Architectural office Pichler
  • 2.000 m²
  • 2015
Next
Prev

Lech Waldschwimmbad | Austria

Client Planner
  • Water Surface
  • Year of Construction
Municipality Lech
  • Architectural office Pichler
  • 700 m²
  • 2020
Next
Prev

Attnang | Austria

Client Planner
  • Water Surface
  • Year of Construction
City of Attnang-Puchheim
  • PG Ernst Karl
  • 1.155 m²
  • 2005
Next
Prev

Andorf | Austria

The pools were planned for sports, families and fun. The 25 metre sports pool with disabled access, the family pool, the diving pool and the children’s paddling pool were separated from each other accordingly.

Client Planner
  • Water Surface
  • Year of Construction
Market town Andorf
  • Architectural office Team M
  • 850 m²
  • 2018
Next
Prev

Zell am See | Austria

Client Planner
  • Water Surface
  • Year of Construction
Municipality of Zell am See
  • Architectural office GINNER
  • 312 m²
  • 2010
Next
Prev

Marchtrenk | Austria

Our second oldest swimming pool is located in Marchtrenk, Upper Austria. For the first time with an external gutter!

Client Planner
  • Water Surface
  • Year of Construction
Market town of Marchtrenk
  • 1.748 m²
  • 1971
groebming oesterreich mehrzweckbecken sport
groebming oesterreich kinderplanschbecken sport
Next
Prev

Gröbming | Austria

Client Planner
  • Water Surface
  • Year of Construction
Municipality of Gröbming
  • Kreiner Architecture Ltd.
  • 481 m²
  • 2010
Next
Prev

Fitness Studios | Austria | Germany

Client Planner
  • Water Surface
  • Year of Construction
Holmes Place, John Harris und ALFA Sports & Spa
voecklabruck oesterreich therapiebecken therapie
voecklabruck oesterreich therapiebecken leer therapie
Next
Prev

Vöcklabruck | Austria

Underwater windows and walking bars make work easier for therapists.

Client Planner
  • Water Surface
  • Year of Construction
Vöcklabruck Regional Hospital
  • VAMED
  • hsb
  • 22 m²
  • 2011
Next
Prev

Saalbach Alpin Resort | Austria

The indoor and outdoor pools are connected by a swimming channel and allow sporty guests to combine training and wellness even in the depths of winter.

Client Planner
  • Water Surface
  • Year of Construction
Alpine resort Reiterhof
  • Architectural office WIMREITER
  • 288 m²
  • 2012
Next
Prev

Kleinwalsertal Rosenhof | Austria

The Rosenhof family hotel in Vorarlberg offers recreation and relaxation for all age groups, as well as varied childcare.

Client Planner
  • Water Surface
  • Year of Construction
The Hugger family
  • 50 m²
  • 2016
Next
Prev

Innsbruck Amraser Strasse | Austria

In the Art Nouveau ambience, two swimming pools invite you to take a dip. Health-conscious swimmers will get their money’s worth, as will leisure swimmers.

Client Planner
  • Water Surface
  • Year of Construction
IKB
  • 430 m²
  • 2016
<< Vorherige Referenz
next reference >>
Back to top